Post A Reply
my profile
login
|
register
|
search
|
faq
|
forum home
»
Allstocks.com's Bulletin Board
»
Micro Penny Stocks, Penny Stocks $0.10 & Under
»
UCOI--MOVING PPS .0029
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by BooDog: [QB] SAN DIEGO, CA, Jul 16, 2007 (MARKET WIRE via COMTEX) -- Unico, Incorporated (OTCBB: UCOI), a natural resource company in the precious metals mining sector, today announced additional reconstruction work at the mill and processing facility at the Deer Trail Mine in Marysvale, Utah. A new photo gallery showing the reconstruction work is expected to be added to the Media section of the Unico website, http://www.unicomining.com, in the next several days. Jean Duvall, the millwright contracted to supervise improvements to the ball mill, has completed the final inspection on the ball mill. Mr. Duvall checked the alignment of the bull gear and pinion gears and made one last final inspection of the main trunion bearings before giving his final approval to operate the ball mill. Once the power has been connected, there will be a dry run, and after any necessary adjustments are made, the balls will be installed inside the ball mill. Assembly of the thickener, which will primarily be used to thicken tailings, is in the final stages of completion. The thickener walls have been erected to their final height and have been completely welded including the angle iron stabilization rims. The thickener bridge, turning mechanism, rakes, decking, and stairways have all been installed. The majority of the safety railings have also been installed. The steel for the remaining railings has been delivered and installation is expected in the next several days. The overflow weirs have been fabricated, and once the weirs have been installed, the unit will be considered complete. Rust inhibitor paint will be applied before the thickener begins operating. The piping and pump requirements for the flotation process are presently in the final calculation stages. The required pumps are either already on site or are immediately available for purchase. Installation of the pumps and piping will commence once the calculations are complete. "The reconstruction work at the mill and processing facility at the Deer Trail Mine continues to progress at full pace, and the final inspection of the ball mill by our millwright, Jean Duvall, is an important step in preparing to operate the floatation process at the facility," stated Mark A. Lopez, chief executive officer of Unico, Inc. "The anticipated completion of the thickener in the new mill building and the installation of the required piping and pumps in the floatation circuit will be additional milestones in the reconstruction process, and we look forward to seeing the remaining work completed so that operations at the Deer Trail facility can begin as soon as possible." Shareholders who would like to sign up to receive information by email directly from Unico, Inc., including when new photo galleries are posted to the company website, are asked to visit the company's website at http://www.unicomining.com/IR/mailinglist.php and fill in the appropriate fields. sounds good. more pictures. i like how they keep everything up to date. some day they may stop the dilution train. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Allstocks.com Message Board Home
© 1997 - 2021 Allstocks.com. All rights reserved.
Powered by
Infopop Corporation
UBB.classic™ 6.7.2