Allstocks.com's Bulletin Board Post A Reply
my profile login | register | search | faq | forum home

» Allstocks.com's Bulletin Board » NASDAQ, AMEX, NYSE Stocks » IDMNF » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused   BadOne  
Good Luck   More Crap   Wall Bang   Were Up   Were Down    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
GMG  - posted
I was looking into this and news came up today, also is this a miss print? Back on 9/5/03 it went from .14 to $155.00 and stayed their for 4 days and then went back to .16. Can anyone tell me what happened and what there opiinion is on this stock?
Indusmin Energy Corporation starts drilling second well Related Stocks
IDM.TO

IDMNF

IZE.BE


KIEV, Ukraine--(BUSINESS WIRE)--Sept. 30, 2003--Indusmin Energy Corp.(TSX:IDM) (IDMNF - news) (IZE:BE- 469065 (Germany)) a dynamic energy player engaged in the acquisition, exploration, development, and production of natural gas and oil worldwide is pleased to announce that it has started reworking well #11 at Krasnopolanske field in the Crimea, Ukraine as part of the work program for developing the Kerch project.

The works at the field will start September 30 and will be completed by November 15th. This is the second well that the company is working on, the previous rework on the well #5 in the same field produced and open outflow of 53 thousand cubic meters per day back in January 2002. Another rework will follow the well #11 within the present year.

"We have gathered all needed equipment and materials for the job and we are currently mobilizing the rig to the site; this second rework is the consolidation of the Kerch project as a valuable enterprise. All the licensing delays are now behind us and we expect to complete our work program as planned," Carlos Munoz, President & C.E.O.

 




Contact Us | Allstocks.com Message Board Home

© 1997 - 2021 Allstocks.com. All rights reserved.

Powered by Infopop Corporation
UBB.classic™ 6.7.2

Share