Post A Reply
my profile
login
|
register
|
search
|
faq
|
forum home
»
Allstocks.com's Bulletin Board
»
Pink Sheet Stocks
»
VHGI
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
UBB Code™ Images not permitted.
[QUOTE]Originally posted by marinamel: [QB] Production Options Based on the outcome of that effort, a small pre-production extraction plant could be used to test the economics and provide certification for a final mining plan. While smaller production efforts could possibly support a profit orientated enterprise, the real commercial value of the Treasure Gulch Mine could be found in the development of the ore reserves at depth and on strike. On the table is a potential joint venture for the development of a centralized mill site to process the ore from the Treasure Gulch Mine and other mines within the adjacent parcels which could form the basis to transition VHGI from an acquisition and exploration company to a revenue based gold and silver production company. Additionally, VHGI is currently reviewing other Gold Lease-Purchase options and other potential acquisitions. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Allstocks.com Message Board Home
© 1997 - 2021 Allstocks.com. All rights reserved.
Powered by
Infopop Corporation
UBB.classic™ 6.7.2