posted
Posted by jerry re rice on the xnrg forum.imo
#1 Posted : 39 minutes ago Xun Pres
Rice #15 oil well in Venango County, Pennsylvania, began production on June 3, 2014. During the first 48 hours of continuous pumping, approximately 150 barrels of water was produced. Water production on startup is normal as the water used in fracking is flowing back and being recovered. As reported by our operator, typically in this area, oil begins to flow after several days of water production.
Thank you for your support and faith in the Company and its management.
Respectfully, Xun Energy, Inc. Jerry G. Mikolajczyk, President, CEO, CFO, Director
Posts: 46 | From: Houston,TX | Registered: Nov 2004
| IP: Logged |